Question bank

 POWER PLANT ENGINEERING

DEPARTMENT OF MECHANICAL ENGINEERING

Question bank

--------------------------------------------------------------------------------------

Q. No

 

UNIT 1

CO

BTL

Marks

1

A

i

Draw the schematic representation of the steam power plant and explain the working of different circuits?

1

2

7

 

 

ii

What are the different types of coals and discuss about coal handling unit briefly.

1

2

7

1

B

i

What is the necessity of coal storage? Discuss different methods used for coal storage at plant.

1

2

7

 

 

ii

Explain the working of Ball-mill pulveriser with neat sketch.

1

2

7

1

C

i

Explain with a simple sketch, working of travelling grate stroker.

1

2

7

 

 

ii

Why feed water treatment essential in a thermal power plant and explain different methods available for the feed Water treatment?

1

2

7

1

D

i

What is the draught system and explain different types of draught with neat sketches.

1

2

7

 

 

ii

With a neat sketch explain the working of cyclonic dust collector

1

2

7

1

E

i

Explain the working of overfeed and underfeed storker firing system with relative merits and demerits.

1

2

7

 

 

ii

Discuss briefly about the spreader strokers with a neat sketch.

1

2

7

 

Q.No

 

UNIT 2

CO

BTL

Marks

2

A

i

Draw the layout of diesel power plant line diagram and describe briefly

2

2

7

 

 

ii

Why the supercharging is necessary in diesel plant? Discuss the methods used for supercharging the diesel engine? What are the advantages of supercharging?

2

2

7

2

B

i

Explain the working of Gas Turbine power plant? Compare the open cycle and Closed cycle Gas Turbine power plant

2

2

7

 

 

ii

Explain briefly compressed air starting system in Diesel power plant.

2

2

7

2

C

i

Explain the working of Gas Turbine power plant? Compare the open cycle and Closed cycle Gas Turbine power plant.

2

2

7

 

 

ii

Mention the advantages and disadvantages of combined cycle power plants with neat sketch.

2

1

7

2

D

i

Explain briefly fuel supply system in Diesel power plant.

2

2

7

 

 

ii

Draw the schematic representation of the Gas turbine power plant layout and explain working of plant briefly

2

2

7

2

E

i

Explain briefly the methods available to improve thermal efficiency of simple gas turbine cycle.

2

2

7

 

 

ii

What are the most commonly used starting systems used in diesel power plants? Explain them briefly

2

2

7

  

Q.No

 

UNIT 3

CO

BTL

Marks

3

A

i

Discuss how hydrograph and flow duration curve be useful for a hydroelectric power plant.

3

2

7

 

 

ii

What is a spillway? Explain with neat sketches, the different types of spillways?

3

2

7

3

B

i

Explain with a simple sketch, the working of pressurized water reactor with relative advantages.

3

2

7

 

 

ii

Explain with a neat sketch a pumped storage hydro plant, state its advantages

3

2

7

3

C

i

Explain the working of runoff river plant with pondage with a neat sketch.

3

2

7

 

 

ii

With a neat sketch, explain a pumped storage hydro plant, state its advantages

3

2

7

3

D

i

Draw and explain with a neat diagram, working of nuclear reactor with all components.

3

2

10

 

 

ii

What factors to be considered while selecting materials for the various reactor components?

3

1

4

3

E

i

What do you understand by a Shielding material? Discuss the desirable properties of a shielding material? Explain why concrete is considered as best shielding material?

3

2

7

 

 

ii

Discuss briefly the health hazard due to exposure to nuclear radiations.

3

2

4

 

 

iii

What are the methods adopted for disposing of nuclear waste.

3

1

3

  

Q.No

 

UNIT 4

CO

BTL

Marks

4

A

i

Explain the procedure for the measurement of carbon dioxide with the neat sketch.

4

2

7

 

 

ii

Describe briefly about the working of storage type hydroelectric plant in combination with Steam power plant.

4

2

7

4

B

i

Explain the working of run –of- river plant in combination with Steam power plant.

4

2

7

 

 

ii

Discuss briefly importance of measurement and instrumentation in power plants?

4

2

7

4

C

i

How do you define the water purity used for power plant? Draw an electrical circuit used to measure the dissolved impurities in water and explain its working.

4

2

7

 

 

ii

Explain the working of pump storage plant in combination with Steam power plant.

4

2

7

4

D

i

Discuss briefly with schematic diagram, integration of gas turbine plant with steam power plant

4

2

7

 

 

ii

Explain with a simple sketch, construction and working of Orsat apparatus.

4

2

7

4

E

i

Explain the instrumentation used for smoke and dust measurement in a power plant.

4

2

7

 

 

ii

Explain the magnetic wind method for the measurement of O2 in the flue gases

4

2

7

 

Q.No

 

UNIT 5

CO

BTL

Marks

5

A

i

What are the sources of water pollution and methods to control it?

5

1

7

 

 

ii

Define diversity factor and load factor. How they influence plant design, operation and economics?

5

1

4

 

 

iii

Define Maximum demand and demand factor

5

1

3

5

B

i

Explain the pollution caused due to gas power plant. How it can be controlled

5

2

7

 

 

ii

What do you understand by connected load and average load?

5

1

2

 

 

iii

Explain load duration curve in detail.

5

2

5

5

C

i

What are the different pollutants evolved from thermal and nuclear power plants? Explain the methods to control them.

5

2

7

 

 

ii

What are the various costs involved in the power plant economics? Explain them briefly.

5

2

7

5

D

i

Discuss different Capital & Operating Cost of different power plants briefly.

5

2

7

 

 

ii

Explain how NOx emissions can be reduced in the flue gases?

5

2

7

5

E

i

Enumerate the latest pollution laws in existence in India.

5

1

7

 

 

ii

What is the impact on the environment and human health for the effluents released from the thermal power plants? Explain how to control them

5

2

7

 